Standardizing the Preparation Stand for Equipment Assembly
Before equipment assembly, the preparation stand had to be adjusted according to the dimensions of each equipment. This created unnecessary movement, manual adjustments and material handling during the preparation process.Different tables were selected according to equipment size, and the table had to be moved and adjusted manually. The preparation process took approximately 15 minutes, required 2 operators, and involved handling around 30 kg per person.A standardized preparation stand was introduced to accommodate different equipment dimensions.With the new design, one stand can be used for different equipment sizes. Table replacement and manual height adjustment were eliminated, allowing the preparation process to be completed by one operator without physical load handling.The preparation time was reduced from 15 minutes to 1 minute, while the safety risk score was reduced from 15 to 2.Reported gain: ₺44,000Kaizen effect: +₺42,500Lean principle:Standardization is not only about making work consistent; it can also remove unnecessary movement, handling and adjustment from the process.